Views: 1 Author: NOVA Elevator Parts Publish Time: 2024-08-07 Origin: Site
Installation process of elevator guide rail
1. Measure the exact location for installing the elevator guide rail,based on the architectural design drawings and elevator size specifications.
2.Install elevator guide rail brackets in elevator shafts.
3.Fix the elevator guide rail on the guide rail bracket according to the predetermined position.
4.Elevator guide rails must be precisely vertical and parallel.Use professional tools to measure and make precise adjustments.
5.Connect all elevator guide rails and fix them on the brackets.
Maintenance of elevator guide rails
1. Regularly check whether the elevator guide rails are vertical and parallel, and check the fixation of the elevator guide rails.
2.Keep elevator guide rails clean.
3.Regularly add lubricating oil to elevator guide rails.
4.Regularly check whether the fasteners of the elevator guide rails are loose.